| Category: | Restaurant Building |
| Tag: | Construction |
| Duration: | 6 Months |
| Starting Date: | 12-7-2017 |
| End Dat: | 13-1-2018 |
| Design By: | Neo Wave Group |
We built this project. Construction took about six months from start to finish, and the ground was leveled. It has about 7 feet of foundation and is weather resistant. It is a type of concrete structure with steel and glass installation. The size of the restaurant and the yard are well-designed and parking is included. Specially designed for good lighting and ventilation.